| 1 |
Replacement of Riser isolation valve |
Each |
250 |
| 2 |
GI riser work upto 4 meters for customer connectivity upto MCV including pre-sleeved hole piece |
Each |
1200 |
| 3 |
Installation of Half round concrete guard - labour charges |
Each |
150 |
| 4 |
Installation of welded riser |
Meter |
350 |
| 5 |
Laying of 32/63 mm PE pipeline with reinstatement |
Meter |
900 |
| 6 |
Laying of 32/63 mm PE pipeline without reinstatement |
Meter |
500 |
| 7 |
Shifting of Service regulator upto 3 meter |
Each |
3000 |
| 8 |
Riser testing, leakage rectification & clamping of riser. |
Each |
50 |
| 9 |
Painting of GI riser & laterals. |
Meter |
95 |
| 10 |
Meter checking (In case if meter is found OK) |
Each |
550 |
| 11 |
Installation/replacement of meter brackets |
Each |
300 |
| 12 |
Installation/replacement of appliance valve |
Each |
200 |
| 13 |
Visit charge applicable on second visit/ technical support request from customer/leakage in case of |
Each |
150 |
| 14 |
Meter replacement work |
Each |
400 |
| 15 |
Inspection of IMC installation |
Each |
250 |
| 16 |
Fixing of PVC Clamps only |
Each |
175 |
| 17 |
Reconnection (of Temporary Disconnected cases only) |
Each |
225 |
| 18 |
Temporary Disconnection |
Each |
200 |
| 19 |
Installation of Hole piece without alteration |
Each |
350 |
| 20 |
Removal of Hole piece without alteration |
Each |
350 |
| 21 |
Only Copper Pipe Work (upto 5 meter) |
No |
500 |
| 22 |
Addition / Alteration of GI Pipe |
Meter |
120 |
| 23 |
Addition / Alteration of Copper Tubing in addition to job done in SR No 2 |
Meter |
65 |
| 24 |
Installation of Meter without alteration Note: CGST & SGST will be applicable extra |
Each |
400 |
| 25 |
Removal of Meter without alteration |
Each |
280 |
|
* Taxes Applicable Extra |
|
|